Home About us Reports Pre-sale News Stock Market Database Custom Company Scan



 researchinchina > report > Heavy Industry > Energy > report

Opportunities under China Policy of Energy-saving and Environmental-protection

Published: Oct/2007

Hard Copy  USD $ 399
Pages: 26 Electronic(PDF)  USD $ 399
Report Code: Enterprisewide  USD $ 798
 

During "the 11th Five-year Plan" period, construction of sewage-treatment projects will flourish in every regions of China, and demands for sewage-treatment equipments will also increase. And it's estimated that in 2010 daily urban sewage treatment ability will increase to be 56.395 million tons, doubled compared with that in 2005.

In China, exhaust gas purification in the work of energy saving and emission cutting focuses on electric power desulfurization. It's demanded that during "the 11th five-year plan" period 355 million KW desulfurization units will be put into operation, of which 188 million KW coal-fired power plants will be built. And with addition of existing 167 million KW, it will form 5.90 million tons of sulfur dioxide subduction capacity.

During "the 11th five-year plan" period, the objective of solid waste treatment lies in that comprehensive utilization rate of industrial solid wastes is to exceed 60%. In 2005, comprehensive utilization rate of industrial solid wastes reached 56.1% in 2005; and in fact that in East China had exceeded 60%. Therefore, key to realize objectives lies in improving comprehensive utilization rate of industrial solid wastes in Central and West China. In accordance with investment budget of State Environmental Protection Administration of China for "the 11th five-year plan" period, total desired investment in such fields as dangerous waste treatment, urban sewage treatment and urban waste treatment is to reach RMB 106.6-128.6 billion.



If this report could not still meet your requirement, or you have any comments or suggestions on it, please leave a message to us.
 
2005-2008 www.researchinchina.com All Rights Reserved